CaseDocker Case Locator
IN REF. EXTENSION OF TIME SOUGHT BY 6TH ADJ INDORE IN HON. CO. DT. 30/09/2020 PASSED IN MCRC NO.3654 Vs // (2021) at Indore Bench
- Court
- Indore Bench
- Case type
- Regular
- Year
- 2021
IN REF. EXTENSION OF TIME SOUGHT BY 6TH ADJ INDORE IN HON. CO. DT. 30/09/2020 PASSED IN MCRC NO.3654 Vs // is a Regular connected with Indore Bench. This public overview records the court, jurisdiction, year, and case reference so people can identify the matter before using CaseDocker for authenticated tracking and collaboration.
Full case timeline, alerts, orders, and tracking are available after signup.
